Everyone in Winsham is familiar with the Jubilee Hall. At the centre of the village, it has been the setting for innumerable meetings and performances. There are few who have not attended a village pantomime, play or concert, and a wide range of age groups from Brownies to Over Sixties have pursued their activities here in the Jubilee Hall. Many have sung or danced, painted or exercised, celebrated a family occasion or at public meetings, argued and discussed.

It was used as a centre for the war efforts in two World Wars-for recruitment, an 'overflow school for evacuees' and lots of other purposes. It is a Polling Centre for national and local elections. There is very little that happens in the village community in which the Jubilee Hall does not play some part.

If you look across Church Street at the Hall you can clearly see the dates 1837 and 1887, which commemorates the building of the Hall in the year of Queen Victoria's Golden Jubilee. Inside the dates are repeated either side of the main window in red and gold. Lord Bridport of Cricket St Thomas built the Hall for the benefit of the village, both as a meeting place and for educational purposes: it was referred to as a Reading Room.

The role of the Parish Council

The Winsham Parish Council, from the date of its first meeting, on the 13th December 1894 has held its regular meetings in the hall, and on December 13, 2014, the parish celebrated the 120th Anniversary of this meeting, to the day, with a dinner, a play based on the history of the Parish Council, written and produced by Stella Abbey, followed by community singing led by Tony Meech. A record of the event can be seen here. The Parish Council also maintains a small office in the building.

If you visit the gallery of this web museum devoted to the history of the Parish Council many references will be found to problems of management and up-keep of the hall. The cost of maintaining the fabric and facilities were always burdensome to the Parish Council, and it was the need to raise some £6,000 to install a heating system that made it necessary, under the terms of a grant from the Glubenkian Foundation, for the Parish Council to apply for charitable status for the hall. In 1965 it became a Charity, administered by a management committee, elected from village organisations and by parish residents. A member of the Parish Council continues to sit on the management committee as a Representative member.

An important social centre

For many years, between the two world wars, within the memory of older people in the village, the highlight of the week was the "sixpenny hop" on Saturday nights. These were even more eagerly attended during the Second World War when American soldiers from the temporary camp at Cricket St.Thomas came along. Flirtations, on the part of the girls and fights, started by the anxious local lads, were a common occurrence. During this period, on weekdays the Jubilee Hall was also used as an 'overflow' school room, made necessary by the influx of children evacuated from the cities.

On-going maintenance and improvement

The gift of the Jubilee Hall to the village was a generous one, and undoubtedly fulfilled a real need. But after its full ownership was transferred to the village in 1904, from the heirs of the 1st Viscount Bridport, its maintenance was also to prove an on-going financial burden on such a small community. It has been necessary to upgrade the hall from time to time to meet changing needs, standards and increasingly rigorous Health & Safety requirements. A major refurbishment was carried out in the 1930s, paid for by the Hall family at Cricket St. Thomas. The decorative 'bell-tower' was removed in the 1950s, as it was the cause of damp damaging the roof timbers. Central Heating was installed in the early 1960s. To meet new safety regulations, plastic chairs, curtains in fire resistant materials, Exit signs and circuit breakers were introduced in the 1980s. In 1989 part of the chimney fell down in a hurricane (damaging the then playgroup leader's car) so the distinctive chimney was shortened.

The main achievement of the very active Management Committee of the 1980s was the building of the new Committee Room and kitchen. Only by looking at the flint south wall of the Committee Room, which was the original outside wall, can one remember that the Committee Room was not always there. The Hall was also improved by the introduction of large stage curtains, and a modular stage, now replaced by an even better one. The main hall window had to be replaced in the late 1990s. All this work required vigorous fund raising activity to meet the substantial costs involved.

Jubilee Hall faces closure - 2004

Worried by what seemed a never-ending flow of incidents requiring relatively small expenditures on repairs to various parts of the fabric of the hall, especially to the floor in the main hall, the Committee asked Rod Wells, a Chartered Surveyor and husband of Sandy Wells, the Hall's Booking Secretary, to conduct a full structural survey, which, with the help of Keith Portsmore, another surveyor who lived in the village, was done without charge.

The results of this investigation were devastating. Serious and on-going rot in the floor support timbers would make the hall unsafe to to use within a year or so. There were also serious situations developing in respect of rot caused by a leaking roof at the back of the hall. This and a whole catalogue of more minor but significant problems added up to the greatest problem to the future of the hall since its construction in 1887. An estimated figure of £80,000 was given as the minimum needed to solve the problems. The Hall held reserves of some £5,000! The final expenditure was to reach nearly £113,000.

After consultations with the Parish Council, the Community Council for Somerset, various opinion leaders in the village and a Public Meeting, where all the options were considered, including the possibility of building a new village hall on some undefined site, it was agreed that an attempt should be made to raise the money through grants and local fund raising.

This was was successfully achieved as a result of a wonderful community effort led by a very active Jubilee Hall Management Committee. Grants were obtained from South Somerset District Council, Defra, Awards for All, Wyvern Waste Management, and a number of other smaller grant providers. The Parish Council gave £15,000, which was raised on the precept. Local people were also very generous with time and money, and this, with local fund raising efforts raised some £30,000. In about eighteen months sufficient money had been raised to commence work. The Hall closed at the end of June 2006 and reopened in January 2007. The transformation was remarkable. The opportunity had been taken to totally update the hall's facilities and appearance.

The detail of the work included a new oak floor and supporting structure, major repairs to various roofing areas, improved heat insulation, refurbished rain ware, an updated heating system, modernised toilet facilities, three-phase electrical supply, Broadband, PA system with loop for those who are hard of hearing, and full compliance with disabled access requirements. Imaginative use of colour in decorating, new curtains and seating completed the metamorphosis into a twenty first century facility, without the hall losing the charm of its late Victorian origin. Most of the work was carried out by businesses or tradesmen living in, or associated with the village, which in no small way accounted for the quality of the work and the high value obtained from the expenditure.

Main hall in 2005
Kitchen in 2005

The years that followed - 2007-2019

In the  years that followed the re-opening of the refurbished Jubilee Hall, work continued. The major project, was the replacement of the main windows at the front of the hall. There were many reasons for doing this. The main window was suffering from severe rot, and such a large area of glass was causing problems with heat loss during the winter months and over-heating of the main hall through solar gain in the summer months. The complex shape of the window meant that a bespoke solution was the only practical approach. The hall's location in a village designated as a conservation area also meant that planning approval was required. This work was carried out, with great skill and ingenuity by a local craftsman, Jamie Orr-Ewing.

The work on the main window was completed in 2014, and the remaining windows , which involved the replacement of the old Critall metal framed windows, installed, it is believed in the 1950s, was carried out in 2016. In replacing the Critall windows, in addition to the practical reasons mentioned above, and improved ventilation, the replacement wooden-framed windows were made in the style of the original windows which were installed when the hall was built in 1887. As with the main window, planning approval was required before the work could begin. This was followed by  a major task on the emergency exit door which was no longer fitting or operating properly.

In 2019, work was done to overcome a major damp problem in the rear of the hall, adjacent to the men's toilets. The total cost of this work during the period from 2007-2019 came to just a little over £23,000, which also included the provision of a high quality digital keyboard, and a more modern digital projector for the main hall, with the associated complex wiring. The installation of the projector and the wiring was done on a voluntary basis by Keith Fowler, helped by his son, Jordan.

During this period, another Winsham craftsman, Dan Anderson, a stone mason with great skill in letter carving, produced a new stone name tablet for the hall, along with access instructions for disabled visitors, also in stone.
All the funding for the above came from a combination of local fund raising by the Jubilee Hall Management Committee, together with grants from 'Awards for All', a part of  the National Lottery organisation.

During this period the hall also suffered a series of set-backs, which included a major flooding incident due to the failure of a plumbing component, and a damp induced collapse of the plastering of a party wall. These all caused short term  disruption in the hall's availability, with the cost of repair being met by insurance claims. A boundary wall also partially collapsed and was subsequently rebuilt.